4Builders
Response within 24h Fully insured Crisp finish No-obligation

Having a herringbone floor laid?
Fixed price upfront, reply within 24 hours.

PVC, laminate or parquet, laid crisply anywhere in Amsterdam inside the ring road. Levelling, skirting boards and trimming doors are part of the same job. Your floor fitter from Oud-Zuid, no platform or middleman.

 4.9 on Google Fixed price upfront PVC, laminate or parquet Fully insured KvK 99333074
Step 1 of 3 Free & no obligation

Which herringbone floor?

Please choose a type of floor first.

Tap your choice, you will continue right away

Please enter the number of m², an estimate is fine.

Please choose what is there now, or "Not sure".

First name is required.

Please enter a valid email address.

Please enter a valid phone number.

Only used for this request. Read our privacy policy

4.9on Google
PVC, laminateor parquet
Fullyinsured
KvK99333074
Where we workAll of Amsterdam inside the ring road
Completed herringbone floor in a living room
Herringbone floor, completed. Our own photo, no stock imagery.

Our work

Herringbone by our own team

Our own photos of our own jobs. No stock imagery.

Herringbone floor being laid, with the stairs protected
Being laid, with the stairs protected
Close-up of a tightly laid herringbone floor
A tight pattern, right into the corner

What does it cost?

What the price depends on

A price per m² says little until we know your floor. These six things determine what it costs. Send us photos and the measurements, and you will get a fixed price in writing.

The subfloor

Concrete, wooden boards or tiles each need a different approach. If the floor is not level, we level it first. Otherwise every bump shows through or the joints open up.

Size and shape

We mitre along every wall. Lots of corners, alcoves or a bay window mean more cutting and more waste.

What is there now

If the old floor has to come out, we remove it and take it away. If there is already a flat, solid floor, it can often stay.

Doors and thresholds

If the new floor sits higher, we trim the doors. Transitions are finished with a matching profile.

Radiators and pipes

We take the radiators off and put them back. Around pipes we cut the floor to fit.

Stairs and access

In an upper-floor apartment in the city centre, everything goes up the stairs and the waste comes back down. We include that in the price.

What our price includes and a web shop price usually does not: levelling where needed, skirting boards, trimming doors, radiators off and back on, and removing the old floor.

How it works

From request to fixed price

No platform forwarding your request to six companies. You deal with us directly.

Today

You request a quote

Three short steps in the form above. You will hear from us within 24 hours.

Within 24 hours

We message you on WhatsApp

We ask for a few photos of the floor and the measurements. Often that is enough for a price.

If needed

We come and look

We measure up and check how level and dry the subfloor is. This costs you nothing.

After that

Your quote arrives

A fixed price on paper, no extra charges afterwards.

What our clients say

"I am very satisfied with the work of 4Builders Vastgoedonderhoud B.V. They helped me very well with the painting and with laying the laminate in my living room. Everything was done neatly and professionally, and they really pay attention to quality. Communication was pleasant and they thought along with me. My living room looks beautiful now. Definitely recommended!"

Naoual · January 2026 · painting and laminate · translated from Dutch · on Google

"Great communication, delivered on promise."

Nikolay Yaremko · June 2026 · on Google

Who you will be dealing with

Local craftsmanship in Amsterdam

Mark Maathuis

Hi, I'm Mark

Your dedicated contact

With our own team from Amsterdam Oud-Zuid, we handle every project with care. You have one point of contact, from the first photo to the last skirting board. Direct contact, clear communication and fully insured (KVK: 99333074).

Why 4Builders

What you can expect from us

Subfloor first

A herringbone floor is only as straight as the floor beneath it. That is why we check it first, and level it where needed.

All in one job

We do the levelling, laying, skirting and doors ourselves. You do not need a second contractor.

Fixed price upfront

After the photos or a visit, you get a fixed price in writing. No extra charges afterwards.

Small, close-knit team

Not a big anonymous company, but craftsmen from Amsterdam Oud-Zuid. You get the same people, every day.

Direct contact with Mark

One point of contact, from the first quote to the final sweep at handover. No call centre.

Old floor out

We remove and dispose of the old floor. In an upper-floor apartment in the city centre, that is often the heaviest part of the job.

Ready for a new herringbone floor?

Request your free quote today. You will hear from us within 24 hours, followed by a fixed price in writing.

Get my free quote

Frequently asked questions about herringbone floors

What does it cost to have a herringbone floor laid?
It depends on the subfloor, the surface area and what is there now. That is why we do not quote a price per m² without knowing your floor. Send us photos and the measurements through the form or WhatsApp, and you will get a fixed price in writing. If we cannot tell remotely, we come and look first.
Does the subfloor need levelling?
Often it does, especially for glued PVC. Herringbone needs a flat subfloor: otherwise every bump shows through or the joints open up. We check it beforehand and tell you where it is needed.
PVC, laminate or parquet: which suits me?
PVC is water-resistant and quiet, and works well in kitchens and hallways. Laminate is affordable and hard-wearing. Parquet is real wood and can be sanded again later. Not sure? Choose "Not sure yet" in the form and we will advise you.
How long does it take?
For 40 to 50 m² of herringbone, count on about three working days, skirting included. If levelling is needed, add a day for drying.
Can I buy the floor myself and have you lay it?
Yes, you can. Send us the order confirmation in advance and we will check the quantity. For herringbone that is about 15% more than the surface area, because every plank is mitred along the walls.
Is 4Builders a registered and insured company?
Yes, we are a registered company (KVK: 99333074) and fully insured with business liability and CAR insurance. You run absolutely no financial risk during the work.
Get a quote in 3 steps